- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业设计论文-近期1.25万远期2.5万污水处理厂毕业设计
重庆大学本科学生毕业设计(论文)
重庆市界石组团排水工程(条件二)
学 生:
学 号:
指导教师:
专 业:给水排水工程
重庆大学城市建设与环境工程学院
二OO九年六月
Graduation Design (Thesis) of Chongqing University
Sewerage Sstem of JieShi Residential Cluster, Chongqing(condition 2)
Undergraduate: Zhi Yue
Supervisor: Gao Xv
Major: Water and Wastewater Engineering
Faculty of Urban Construction and Environment
Engineering, Chongqing University,
June,2009
摘 要
根据设计任务书原始资料,对界石组团进行污水管网、雨水管网和城镇污水处理厂的设计。
界石组团位于花溪河流域,以丘陵地貌为主。该组团受冬季风和夏季风影响,主导风向为偏北风,次主导风向为偏南风。2010年市区人口规模为4.8万人,2020年人口规模达到6.4万人。
界石组团排水工程包括排水管网工程和污水处理厂工程两部分。
界石组团排水管网采用雨、污分流制。污水经管网收集后由A、B两条主干管输送至污水处理厂,处理达标后排放入花溪河水体,雨水直接排放,防洪标准采用20年一遇防洪标准。排水管网按远期2020年人口规模设计。污水厂设在组团西北端,南部设一中途泵站提升污水。
界石组团水污染源主要为生活废水,次之为工业污染源,工业废水其主要含有化学需氧量、悬浮物及石油类。污水处理出水水质标准采用《城镇污水处理厂污染物排放标准》(GB18918-2002)中的一级标准B标准。污水处理厂污水处理工艺采用三沟式氧化沟工艺。
污水厂近期设计规模为1.25万m3/d,远期设计规模为2.50万m3/d,远期总占地2.86公顷,近期建设留有远期用地。
关键词:重庆市界石组团,排水管网,分流制,污水处理,三沟式氧化沟
ABSTRACT
Dseign the pipeling system of sewerage and storm water as well as the wastewater treatment plant according to the requirement and the fundamental design data of Jieshi residence cluster.
Jieshi residence cluster is located at the drainage area of Huaxi river, mainly in hilly topography. The whether is influenced by monsoon in winter and summer.The dominant wind direction is a deflection of boreas,and the secondary is a deflection of south wind.The population scale of Jieshi residence cluster is 48,000 in 2010,and up to 64,000 in 2020.
The drainage project of Jieshi residence cluster consists of two part,the drainage system and wastewater disposal.
Separate sewage system is selected all over the residence cluster. The discharged wastewater is collected by the sewage network and carried to the wastewater treatment plant by A,B trunk pipes. After proper disposal the treated water will releas into the Huaxi river. On the other hand the storm water is discharged into the river directly. The flood contral standard is the high flood level which is expected to happen during twenty y
您可能关注的文档
最近下载
- 高级客房服务员知识试卷〔〕.doc VIP
- 第16课探索国家出路与挽救民族危亡的努力【中职专用】《中国历史》(高教版2023基础模块).pptx VIP
- 2025中国工商银行浙江省分行纪检岗和安防消防管理岗社会招聘笔试模拟试题及答案解析.docx VIP
- OFICE办公软件学习珍藏——Excel使用技巧大全.pdf VIP
- DB3713_T 307-2023 兼职矿山救护队建设规范.pdf VIP
- 初一21班主题班会《我爱我班》.ppt
- 2025中国工商银行浙江省分行纪检岗和安防消防管理岗社会招聘备考练习试题及答案解析.docx VIP
- 99S203 消防水泵接合器安装.docx VIP
- 乳糜尿护理常规.pptx
- 防雷检测应急预案.doc VIP
文档评论(0)