区域供热节能控制系统设计.doc

  1. 1、本文档共51页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
区域供热节能控制系统设计

目录 摘要.......................................................2 引言.................................................................4 第一章、S7-200PLC的概述 ........................................... 5 1.1 S7-200系列PLC的概述........................................ .5 1.2 S7-200的物理结构............................................5 1.3 S7-200的硬件................................................ .7 1.4 S7-200的工作原理........................................... .8 S7-200的编程语言.......................................... 11 第二章、组态软件....................................................... 2.1 组态的定义...................................................... 2.2 力控组态的特点.................................................. 2.3 力控设计步骤................................................... 第三章、触摸屏 3.1 触摸屏的基本知识 3.1.1电阻触摸屏 3.1.2电容技术触摸屏红外触摸屏表面声波触摸屏 Abstract Energy-saving heating systems is right Programmable Logic Controller, configuration, and Touch-screen done a detailed presentation and the entire system design. Li Configuration Software design chosen as a PC control software Under the plan was using the Siemens PLC226 and PLC224 and produced a flow chart programming. Energy-saving heating system, boiler, heat pipe network and the use of thermal equipment as part of a three overall thermal system to be considered Overall use of energy-saving heating systems, in accordance with the actual users of thermal temperature requirements for thermal control system as a whole. Set the outdoor and indoor temperature and the temperature control process control design curve also external slip road network control system equipment for the intelligent control function, According to the different requirements of different users for hours, the temperature, regional, sub-slot intelligent network control outside the buildings temperature, also need to monitor in accordance with the operating records and other system failures. Under the plan in accordance with the design of the different control procedures flexibility to

您可能关注的文档

文档评论(0)

2017meng + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档