施耐德精益生产系统定义【英文版】.pptVIP

施耐德精益生产系统定义【英文版】.ppt

  1. 1、本文档共80页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施耐德精益生产系统定义【英文版】

Terms Definitions Schneider Production System Version 2010 r1 How to Use 1. View the presentation in “Slide Show” mode 2. Go to the index on the next two pages 3. Select a topic, click on the button 4. To return to the index, in the lower right corner, click on the INDEX 1 INDEX 2 Acronyms A-M Acronyms M-P Acronyms R-Z 5 S 5 S’s: From the Japanese: “Seiri” Sort, eliminate or get rid of unnecessary items. “Seiton” Straighten, organize tools, materials and information in logical order or manner for predictable use. “Seiso” Scrub, clean away all dirt and remove trash. “Shitsuke” Standardise, do all work in accordance with documented and visual standards. “Seiketsu” Systemise, make these steps a habit: they’re done daily throughout the organization. 5 Why’s 5 Why’s: This is an incredibly simple yet effective tool: do not be satisfied with an answer to a problem until you have asked why at least 5 times to drill down to the root cause. 8D “8 Disciplines” 8D: “8 Disciplines” is a problem-solving methodology for product and process improvement. It is structured into eight disciplines, emphasizing team synergy. One purpose for 8D is to explore the control system, which allowed the problem to escape. The Escape point is studied for the purpose of improving the ability of the Control System to detect the failure or cause when and if it should occur again. Another key advantage to 8D is the prevention loop, which explores the systems that permitted the condition that allowed the Failure and Cause Mechanism to exist in the first place. 8D is very much related to the FMEA process in that it deals with the Failure Modes and Causes after they occur where FMEA attempts to anticipate them before they occur. 7 Wastes of Lean 7 Wastes: lean manufacturing focuses on eliminating seven causes of waste. The elimination of these wastes leads to higher quality, improved delivery, higher productivity and increased worker safety. Andon Andons: are devices used by operat

您可能关注的文档

文档评论(0)

zijingling + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档