工程项目群进度优化激励机制分析-analysis of incentive mechanism for project group schedule optimization.docx

工程项目群进度优化激励机制分析-analysis of incentive mechanism for project group schedule optimization.docx

  1. 1、本文档共79页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目群进度优化激励机制分析-analysis of incentive mechanism for project group schedule optimization

management was quantitatively studied. The main works as follows:(1)Firstly analysis the management problems in the practice of construction programme, based on the integrated management theory, innovates the integrated construction programme Six-dimension integrated management system, namely the integrated management system which contains the programme organization, the programme element, the programme lifecycle, the programme objective, the programme information system and the programme technology knowledge.(2)From the view of realizing the best construction programme scheduling and lifecycle utility maximization, considering the influence of the programme owners expected operating income, the contractors opportunity return and the reputation gain, supposing the contractors total cost was constituted with direct cost, indirect cost and scheduling compression cost, and the scheduling compression cost was appreciatively expressed with time-cost relationship index function, then a construction programme Stackelberg master-slave hierarchical decision model in which the programme owners for upper policymakers and the contractors for lower policymakers was constructed. The model was solved by heuristic genetic algorithm, and the effectiveness and feasibility of the optimization model was proofed through example calculation analysis.(3)Considering the influence of the flexible resource constraints,the forms and the methods of engineering progress payment, the owners expected operating income ,the reputation gain, and the contractors opportunity return, supposing the contractors total cost was constituted with own resource cost and flexible resource cost, then a construction programme Stackelberg master-slave hierarchical decision model under the flexible resource constraints was constructed, the model was solved by heuristic genetic algorithm, and the feasibility of this incentive model on scheduling optimization was proved through example calculation.KEY WORDS: constr