西格玛 SS ntroduction.pptVIP

  • 4
  • 0
  • 约2.06万字
  • 约 77页
  • 2018-06-06 发布于江苏
  • 举报
西格玛 SS ntroduction

* e.g. Project authorization sheet (charter) GO TO PAGE 49 * * Noise variable definition: Cannot toggle days, operator, relative humidity Multi vari can be used for both noise and controllable DOE not always needed for GB project If DOE needed on GB project, it will be done under guidance of mentoring BB. ANOVA means ANalysis Of VAriance Question is not is something better, is it “statistically significantly” better GO TO PAGE 51 * * For GB Critical Xs are sometimes 2 to 3 If question of Long term vs short term comes up, it will be covered in later section GO TO PAGE

文档评论(0)

1亿VIP精品文档