外文翻译美国钢铁公司神户制钢冶金钢包的安装及运营
Installation and operation of a ladle metallurgy facility at USS/Kobe Steel
INSTALLATION of a ladle metallurgy facility (LMF) at Lorains continuous caster spanned 90 days from groundbreaking to the first successful heat of steel. The primary reason for this relative short installation and start-up time was the cooperation and communication between engineering, operating and maintenance departments, and the installation contractors.
The Lorain facility, formerly a USS Div. of USX Corp., is now a joint partnership (50/50) between USS and Kobe Steel Ltd.
The plant occupies 2.70 sq miles on the south side of the city of Lorain, Ohio, approximately 25 miles west of Cleveland, near Lake Erie.
The plant is a primary source of bar products mostly directed at automotive and fastener industries as well as seamless and ERW pipe for oil country and other petrochemical applications. It has three operable blast furnaces (2 x 1500tons/day and 1 x 3600 tons/day), two 220-ton BOF vessels and a continuous caster.
The caster produces a variety of cross-sections and steel grades for sourcing the plants finishing facilities as well as customers. Caster capacity is 750,000 tons/year, but it has already achieved 900,000 tons in a calendar year. The balance of the raw steel produced, approximately 2 million tons/year, is converted to 11-ton ingots which are rolled at the 46/40-in. tandem breakdown rolling and sizing mills. Finishing facilities include one 12-in. and one 10-in. bar mill for rounds rated at approximately 750,000 and 420,000 tons/year, respectively. Bar mill product ranges in.size from 0.464 to 3.0625 in. Tubular facilities include two seamless piercing mills producing product from 2 to 26-in. OD with a cornbined annual capacity of 540,000 tons and one ERW mill for product in the 2 to 6-in. OD range with an annual capacity of approximately 110,000 tons.
Attempts to justify a buffer between the BOF and caster, whether a ladle furnace or a plasma torch heating unit had been
您可能关注的文档
最近下载
- 文学类文本陈国凡《饭局》阅读练习及答案(湖南2022届高三下5月).docx VIP
- 地基基础 课程教案.doc VIP
- 电力专业英语词汇.doc VIP
- 色度-方法确认报告方法验证方法证实报告.docx VIP
- 《Python程序设计实验》课程大纲(本科).docx VIP
- 七年级上册第二单元+友谊的天空+课件-2026年 中考道德与法治一轮复习.pptx VIP
- 河流动力学概论绪论.pptx VIP
- 一种基于数字孪生的仿真推演系统.pdf VIP
- 7.2.2“白山黑水”——东北三省 课件 2025-2026学年人教版地理八年级下册.pptx VIP
- 2025年陕西省中考语文试卷真题及答案详解(精校打印版).docx
原创力文档

文档评论(0)