smthome_control_plan控制阶段1.ppt

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
smthome_control_plan控制阶段1

Control Plans What elements make up a control plan Why should we bother with them Who contributes to their preparation How do we develop one When do we update them Where should the plan reside High risk areas only! Importance to Customer (Why) The only reason a control plan exists is to ensure that we consistently operate our processes such that product meets customer requirements ALL THE TIME! Customer Product/Part Process Requirement Characteristic Characteristic Process Production Control Control Plan Quality Function Deployment (QFD) process Control Plan Roadmap Collect existing operating documentation for process Determine scope of process for current control plan Form teams to update documentation more than one quarter old Short term capability studies should be replaced with long term capability results Fill in Control Plan Summary based on review of updated operating documentation Identify missing or inadequate components - gaps Pay particular attention to adequacy of training, maintenance, operating and reaction plans Assign tasks to team members to complete missing plan elements Verify compliance with plant documentation requirements (Re)train operations and maintenance personnel Collect sign-off signatures from safety environmental, maintenance, operations and process engineering Verify control plan effectiveness in 6 months with long term capability study Control Plan Strategy The intent of an effective control plan strategy is to: Operate our processes consistently on target with minimum variation Minimize process tampering (over-adjustment) Assure that the process improvements that have been identified and implemented become institutionalized. ISO can assist here. Provide for adequate training in all procedures Include required maintenance schedules Revise Quarterly Factors Impacting a Good Control Plan Measurement Preliminary System Analysis MSA, Process Short Term %RR Maps

您可能关注的文档

文档评论(0)

qiwqpu54 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档