建筑专业毕业设计外文翻译2.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑专业毕业设计外文翻译2

Using Weibull Analysis for Evaluation of Cost and Schedule Performance Khaled M. Nassar1; Hordur G. Gunnarsson2; and Mohamed Y. Hegab, P.E.3 Large amounts of money are lost each year in the construction industry because of poor schedule and cost control. Few contractors specify and follow systematic schedule monitoring practices. Traditionally, the earned value method EVM is used to control and monitor schedule performance using the schedule and cost performance indices which compare the budgeted cost of work performed to what was originally scheduled or what is actually expended. This paper presents a statistical approach, namely Weibull analysis, to evaluate stochastically the schedule performance of construction or design projects. The approach can be used in conjunction with the EVM to enhance the evaluation and control of schedule performance. Weibull analysis is a common method for failure analysis and reliability engineering used in a wide range of applications. In this paper, the applicability of Weibull analysis for evaluating and comparing the reliability of the schedule performance of multiple projects is presented. The various steps in the analysis are discussed along with an example in which two projects are analyzed and compared. The authors conclude that Weibull analysis has several advantages and provides a relatively robust and effective method for construction managers to better control and monitor their projects. Construction projects are seldom “on-schedule” all the time. The amount of work performed on the project usually fluctuates from one period to the other. In fact, according to the “80 / 20” rule. suggested by the 18th Century economist, Pareto 80% of the effort will be expended during 20% of the project duration. This creates a significant problem in trying to monitor the actual performance of the project schedule and specifically trying to decide whether or not the project can finish on time., the reliability of the project schedule

文档评论(0)

sanshengyuan + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档