- 1、本文档共29页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
REQUIRED FORM ‘A’ DIA Business Center Home Page所需表格‘A’ DIA商务中心主页
_________________________________________________________________________________________
PART IV – REQUIRED FORMS 1/28/2013
Gatehold Television Programming and Advertising Services
__________________________________________________________________________________________
PART IV – REQUIRED FORMS 12/20/2012
Pet Day Care, Boarding and Grooming Services
REQUIRED FORM ‘A’: PROPOSAL CHECKLIST
Proposal for: FORMTEXT Gatehold Television Programming and Advertising ServicesEntity Proposing: FORMTEXT click here to enter textAuthorized representative of proposer: FORMTEXT click here to enter textMailing address: FORMTEXT click here to enter textOffice phone: FORMTEXT click here to enter textCell phone number: FORMTEXT click here to enter textE-mail address: FORMTEXT click here to enter text
The following information, forms and documentation are to be included in the proposal. All forms are to be completed in full, signed, and included in the bound proposal in the section indicated.
1. Cover Letter – (two page limit)
2. Proposed Concept and Menus or Merchandise Lists
a. Detailed Description of Concept/Brand
b. Concept Conformity
c, Brand Background
d. Advantages to DIA
e. Deviation or adaptations of Concept
f. Published reviews or awards
g. Menus or Merchandise Lists and Pricing
3. Experience and Qualifications
a. Minimum Qualifications
b. Overall Experience
c. Experience with this Concept
d. Experience with Similar Concept
e. Locations
f. Management Team
g. Operations Team
h. References
i. Defaults and Terminations
j. Delinquent Debts or Arrearages
4. Facility Design/Construction
a. Plan and Description of Proposed Facility
b. Investment Commitment
c. Schedule for Design and Construction
5. Management Plan
a. Staffing Plan
b. Operations Plan
c. Customer Service Plan
6. Business Plan
a. Quality Control and Supervision by Owner
b. Financial Pro Forma
c. ACDBE Participation
7. Required Forms
A. Proposal Checklist (T
您可能关注的文档
- Matlab课程设计SSB信号仿真分析.doc
- Macroinvertebrates of small water bodies in the nort 在北方小水体底栖动物.ppt
- Maryland Professional Development马里兰州专业发展.doc
- MATLAB课程设计MATLAB语音信号采集与处理.doc
- MATLAB课程设计恶狼追兔可视化问题.doc
- matlab课程设计基于MATLAB控制系统根轨迹法分析.doc
- matlab课程设计基于Matlab直流电机双闭环调速系统设计与仿真.doc
- matlab课程设计利用MATLAB仿真软件实现图像去噪处理.doc
- MATLAB8.X程序设计及典型应用第六章 数据和函数可视化.ppt
- MATLAB课程设计基于MATLAB离散系统Z域分析.docx
最近下载
- 备战高考英语话题通关精准练:科学探索(词汇+阅读+写作)(解析版).docx VIP
- 普通高中音乐新课程标准试题与答案(2017年版2020年修订).pdf
- 部编版语文五年级上册第五单元【集体备课】.pptx
- 学校高质量发展方案.docx VIP
- 会计档案培训课件.pptx
- 尼康数码单镜反光照相机D6说明书.pdf
- 2022-2023年新人教版小学道德法制四年级上册第二单元第四课《少让父母为我操心》说课稿含板书.docx VIP
- 人教版热机-优秀课件课件.pptx
- 如何做好医院开发.pptx VIP
- 北师大版小学数学三年级上册第四单元 乘与除 大单元整体教学设计学历案教案附作业设计(基于新课标教学评一致性).docx
文档评论(0)