Practical Considerations for ource Area Treatment CLUIN源区处理的实际考虑cluin.pptVIP

Practical Considerations for ource Area Treatment CLUIN源区处理的实际考虑cluin.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Practical Considerations for ource Area Treatment CLUIN源区处理的实际考虑cluin

Practical Considerations for Source Area Treatment: Interim Measures Dean Williamson, P.E. CH2M HILL Constructors, Inc. December 11, 2002 Presentation Outline Advantages of In-situ Groundwater Source Area IMs Conducted at the Charleston Naval Complex (CNC) Within the overall project environment (BRAC, Federal property transfer, RIP/OPS, GFP Contract) Within RCRA Corrective Action Context Practical Considerations for In-situ Source Area Treatment Projects What is the Charleston Naval Complex (CNC) and the CNC Insured Environmental Contract? Navy’s First Performance-Based Insured Fixed-Price Remediation Contract: investigations, remedial planning, and remedial action to close out over 170 RCRA and over 70 UST sites, plus Pb-based paint abatement, other work preparing property transfer documentation (FOST/EBS) OM for remedial systems for 20 years investigation and remediation of newly discovered Navy-related sites for 20 years $65MM of combined Remediation Stop Loss and Environmental Impairment Liability insurance two year target schedule for property transfer CNC Insured Fixed Price Project Progress to Date Over half the RCRA and most UST sites have received NFA status; on track to have NFA or RIP/OPS for remaining sites in 2003 ~65 percent of property already transferred to RDA or ready for transfer in 2002; remainder to transfer in 2003 Nominated by SCDHEC/EPA as RCRA Showcase Pilot viewed by regulators and Navy as a highly successful project and a model for innovative streamlining for RCRA Corrective Action programs significant credit for project success goes to the regulators To date, 23 RCRA IMs Completed Including 6 For In-situ Groundwater Source Area Treatment Electrical Resistance Heating (ERH) at a Dry Cleaner (AOC 607) In-situ Chemical Oxidation (ISCO) at three sites - dichlorobenzenes (AOC 561,SWMU 196); DDD (SWMU 38) In-situ Chemical Reduction (ISCR) ZVI - hexavalent chromium (SWMU 25/70) and TCE (SWMU 166) Why Interim Measures at the CNC? Without an

您可能关注的文档

文档评论(0)

erterye + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档