大工秋《水电站建筑物》.docVIP

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工秋《水电站建筑物》.doc

大工13秋《水电站建筑物》 Great worker, 13 autumn, building of hydropower station, online test, 2 I. judgment questions 1. the gate is located on the upstream side of the work gate, and the gate and its gate shall be checked and used to stop water. It is required to open and close in still water when it is used. A. error B. correct The correct answer: B 2. hydraulic calculation of pressure tunnels include two kinds of steady flow and unsteady flow calculation. A. error B. correct The correct answer: B 3. the pressure front tank is set at the end of the diversion channel or the non pressure tunnel. It is the connecting structure between the water diversion station and the pressure pipe. A. error B. correct The correct answer: B 4. non pressure intake is suitable for water intake from natural river or reservoir with little change of water level. Its main feature is deep water and no pressure flow. A. error B. correct The correct answer: A 5. the choice of water diversion route in the diversion tunnel requires the tunnel to be the shortest on the plane, and the depth of burial on the face is required to be shallower. A. error B. correct The correct answer: A 6. in the layout of the penstocks, when the factory and the room longitudinal joints, and the water inlet pressure piping in the dam body in every section of the central government, so that the thickness of concrete pipes on both sides of the same, the uniform stress. A. error B. correct The correct answer: B 7. the selection of the pressure piping route shall meet the safety requirements of the operation. The layout of the pipe shall be arranged on the ridge to prevent the landslide or falling stones from damaging. A. error B. correct The correct answer: B The function of the 8. piers is to fix the steel tube with self weight, and to bear the axial unbalance force caused by the change of the direction and diameter of the steel pipe. A. error B. correct The correct answer: A 9. the force acting on the steel pipe and the pier s

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档