E-HY_2011_09-ER-14-CS18-00中英.docVIP

  • 5
  • 0
  • 约2.05万字
  • 发布于湖北
  • 举报
  • 文档已下架,其它文档更精彩
Contract No. HY/2011/09 Employer’s Requirements Hong Kong-Zhuhai-Macao Bridge Part 14 – Construction Specification Hong Kong Link Road – Section between Section 18 – Steelwork HKSAR Boundary and Scenic Hill Arup ER-14-CS18/ PAGE 3 October 2011E-HY_2011_09-ER-14-CS18-00SECTION 18STEELWORKGENERALSteelwork18.01(4)All measurements shall be made by means of an approved steel tape or other instrument. Dimensions of all steelwork given on the Drawings are assumed to be taken at a temperature of 22°C.尺寸假定为22°C情况下(5)Structural steelwork shall be fabricated and erected by specialist contractors in the

文档评论(0)

1亿VIP精品文档

相关文档