智能电网组成,同步相量在广域监控和保护应用.ppt

智能电网组成,同步相量在广域监控和保护应用.ppt

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
智能电网组成,同步相量在广域监控和保护应用

An application installed in 2007 uses direct relay-to-relay synchronized phasor measurements. One of the AGSSs (automatic generation-shedding schemes) in service at the Angostura Hydroelectric Power Plant monitors the loss of the transmission link between Chicoasen and Angostura. During normal conditions, Angostura can generate as much as 5 ? 180 = 900 MW, while the total load of the Tapachula and South Chiapas region does not exceed 100 MW. The excess power in the region flows from Angostura to Chicoasen and from there to the rest of the system. If two 400 kV parallel lines are lost between Angostura and Chicoasen, both areas remain connected through the 115 kV network with the following consequences: The transfer impedance between the Angostura and Chicoasen power plants increases, causing the Angostura machines to accelerate. This machine acceleration may lead to angular instability. The 115 kV network is overloaded until the line or transformer overload protection operates. When this happens, the Angostura and Tapachula area forms a network isolated from the rest of the system. For some operating and fault conditions, this double contingency could lead to a blackout at Tapachula City and south of the State of Chiapas. Simple logic is applied in the relay using a local phasor that has been time-delayed to exactly match the time from the received phasor data. The event report on this slide shows how wide-area measurements are used in a protection system. The internal relay points captured in the report are as follows: IW Angostura-Chicoasen currents IX Angostura-Sabino currents ROKRPM Received remote data successfully PMDOKT Total data successful FOP01 Angle difference element set to 3 degrees FOP03 Angle difference element set to 4 degrees FOP04 Angle difference element set to 5 degrees The angle difference element operating time includes the PMU measurement delay, communications channel delay, and latency because of the message rate. In this case, 20?messages

文档评论(0)

fangsheke66 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档