- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文翻译公路工程变更原因分析及其对工程造价的影响
Highway engineering change reason
analysis and cost of the project of influence
Abstract: in the implementation stage because of highway engineering design factors, environmental factors, the influence of various engineering changes happened is more common, combining with engineering practice, this paper discusses the causes and engineering change of project cost.
Keywords: engineering change, Reason, Cost
Due to the highway project period, long, long line, so broad in construction of various causes by the engineering change is inevitable. Engineering change could lead to increase of construction cost or time limit of the owner and the contractor, between the claim will claim and the cost of the project.
Owner of change and the causes of the cost
And when the owner change engineering bidding of construction conditions of commitment. SanTongYiPing referred to in the preceding paragraph, the engineering tight finish, delay purpose will increase the contractors settlement fee, but little impact on total cost, the owner or project quantity change projects. Increase the project content or quantity, will increase the cost, Project content or cancel or reduce the number will reduce cost, but may affect the use function of engineering, because the owner with agreements for the existence of incomplete, or in the contract when division, can increase content of missing the contract cost, and the owners requirements, and shorten delivery of finished ahead of the original contract period, invest more in construction unit cost of manpower and material resources, to increase, and improve the design standard requirement owner, beautiful Angle from security requirements of engineering structure change type, elevation, baseline, location, size and strength, make cost increase, and the owner to change in the construction organization design has approved the construction plan, cost increase, and the owner of the contract with the owner of the materials or equipment supply for the cat
您可能关注的文档
最近下载
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第10章.ppt VIP
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第9章.ppt VIP
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第8章.ppt VIP
- 家畜饲养学复习资料.pdf VIP
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第7章.ppt VIP
- 铁路局校园招聘机考真题.pdf
- 《GBT25775-2010-焊接材料供货技术条件产品类型、尺寸、公差和标志》.pdf
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第5章.ppt VIP
- 环境科学导论第2版 赵景联 史小妹环境科学导论-第4章.ppt VIP
- 各部门岗位说明书.doc VIP
原创力文档


文档评论(0)