网站大量收购独家精品文档,联系QQ:2885784924

中国高速铁路客车毕业设计(论文)文献翻译.doc

中国高速铁路客车毕业设计(论文)文献翻译.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国高速铁路客车毕业设计(论文)文献翻译

PAGE PAGE 1 毕业设计(论文) 英文文献翻译 学 院: 机电工程学院 专 业: 车辆工程 姓 名: 学 号: 导 师: 日 期: High-speed passenger car of china Chinese in the development of high-speed railway field is some developed countries in the world since the late, but the rapid development of the 21st century, in a world of bits. May 1998, guangzhou-shenzhen railway electrification transformation, design the highest speed per hour for 200 kilometers, in August guangzhou-shenzhen railway pioneered the use of the lease by Sweden X2000 tilting high-speed train . Because all adopted in the 1990s many reached international advanced level,so the technology and equipment at guangzhou-shenzhen railway lines as China into the transformation from the beginning of high-speed railway. But Chinas first real sense of high-speed railway in 2002, was opened at qing-shen passenger line design reach speeds, 200-250 kilometers, the star of power in qing-shen passenger trains were created the first rate China railway 321.5 km/h, caused a sensation. In 2007, the China railway sixth great speed, Chinas first in every major trunk (such as beijing-shanghai line speed rail line, and JiaoJiXian jingha, etc) as per hour scale operation of 200-250 kilometers in the China railway high-speed (CRH) emu train, reached the world advanced level of the existing speed modification. August 2008, Chinas first design of 300 kilometers per hour of high-speed railway - the beijing-tianjin inter-city railway traffic operation. Until October 2009, China top operation of more than 200 kilometers per hour speed railway mileage has reached nearly 85 kilometers, including the reconstruction of the existing railway after speed and the new high-speed railway. Currently under construction and planning of the high-speed railway construction total mileage 1.7 million kilometers has reached, including five types of line: has been the four PDL, inter-city passenger system, the speed of existing, perfect network layout and the western developmen

文档评论(0)

a888118a + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档