- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
填土软基注浆加固处理实例分析Case study on grouting reinforcement treatment of soft soil foundation
填土软基注浆加固处理实例分析(Case study on grouting reinforcement treatment of soft soil foundation)
Case study on grouting reinforcement treatment of soft soil foundation
Time: 2011-04-22 11:56:57 Author: rank name
The plain fill soil is dark brown and loose, composed of limestone, crushed stone and small amount of cohesive soil. The thickness is 2.5 ~ 4.6m, which belongs to weak soil and is unstable. Because the restaurant surrounding the distribution of oil pipeline and buildings, processing range is small, is not suitable for the pile foundation and dynamic compaction, considering the grouting in the soil for composite foundation, the value of FAK is not less than the bearing capacity of the 200Kpa composite foundation, the compression modulus Es is no less than 20Mpa and can meet the design requirements. The construction and inspection of this project are in good condition, and it is proved that it is feasible to reinforce the foundation by grouting in the filling ground.
Keywords: fill, grouting, foundation reinforcement
I. General Situation of the project
Dalian Petrochemical new plant construction project, the site is located in Dalian Petrochemical Branch Hospital, the proposed restaurant length 36.0m, width 20.7m, two storey frame structure.
Two, the following basic engineering geological conditions and groundwater
(1) engineering geological conditions under the foundation;
The plain fill is dark brown and loose, composed of limestone, crushed stone and small amount of cohesive soil. The thickness is 2.5 ~ 4.6m, which belongs to weak soil and is unstable.
The middle weathered limestone has a medium thick layer structure, the core is fragmental and short columnar, and the rock mass is broken. It is a soft rock, and the rock mass is of the fourth grade.
(two) ground water
The groundwater level is 2 ~ 3.0m, which is the phreatic water mixed by the sea and the Quaternary, and the water level is influenced by the tide.
Three, design parameters
Because the restaurant surroun
您可能关注的文档
- 习作教学我敬佩的一个人100.ppt
- 云南工商学院学生专业实习记录.doc
- 云贵高速铁路施工组织设计路基 桥梁 隧道.doc
- 云锦佳园一期别墅斜屋面施工方案 2.doc
- 云阳县盘龙镇污水处理工程污水管网施工组织设计3secret.doc
- 五三通验收表六牌一图标语和警示标志.doc
- 五年级上册语文期末测试题五六.doc
- 云南省昆明市2015年中考英语试题word版含解析2.doc
- 五年级英语下册 unit13 lesson761 人教新起点.doc
- 云南省昆明市中考英语试题word版含解析.doc
- 外墙保温工程采购投标书竞争性谈判投标书.doc
- 地图学6专题地图编制06611.ppt
- 外墙砖粘贴的施工要点质量通病及预防措施.doc
- 外文文献翻译洛阳双空间尺度的生态城市建设.doc
- 外文文献及翻译基于LMS自适应滤波器在直达波消除中的运用Using LMS Adaptive Filter in Direct Wave Cancellation.doc
- 外文翻译 基于TMS320VC5402的自适应FIR滤波器的设计.docx
- 外文翻译YZ12振动压路机简介.doc
- 外文文献及翻译基于 AT89S51 单片机的微型土壤湿度检测仪设计.doc
- 外文翻译仓储管理.DOC
- 外文翻译信息时代的工业设计.doc
原创力文档


文档评论(0)