基于实时监测的高等级公路路基压实质量快速评估emlbh15l.docxVIP

  • 3
  • 0
  • 约1.28万字
  • 约 13页
  • 2018-09-11 发布于湖北
  • 举报

基于实时监测的高等级公路路基压实质量快速评估emlbh15l.docx

基于实时监测的高等级公路路基压实质量快速评估emlbh15l

基于实时监测的高等级公路路基压实质量快速评估刘东海1巩树涛1魏宏云2(1. 天津大学水利工程仿真与安全国家重点实验室 基于实时监测的高等级公路路基压实质量快速评估 刘东海1 巩树涛1 魏宏云2 (1. 天津大学水利工程仿真与安全国家重点实验室,天津 300072; 2. 天津市市政公路管理局,天津 300050) 摘要: 高等级公路路基压实质量通常采用的事后抽检方法不能满足碾压过程中对压实质量的实时、连续监控的要 求,且用有限的检测点去评估整个工作面的压实质量往往存在较大偏差。利用研制开发的路基压实效果实时监测 装置,自动在线采集路基压实监测值(CV),进而在分析 CV 与路基弹性模量、压实度的相关性的基础上,建立以 CV 为变量的路基压实质量的评估模型,提出路基施工全工作面压实质量的快速评估方法,实现施工工作面任意位置 处压实质量的估计及整个工作面压实质量合格率的分析。该方法可有效避免事后抽检方法的片面性和滞后性,为 高等级公路路基压实质量的实时控制提供一条新的途径。 关键词: 高等级公路; 路基碾压; 质量控制; 实时监测; 质量评估 中图分类号: U416. 1 文献标识码: A 文章编号: 1000-131X(2014)11-0138-07 Fast assessment on compaction quality of highway subgrade based on real-time monitoring Liu Donghai1 Gong Shutao1 Wei Hongyun2 (1. State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China; 2. Tianjin Municipal Highway Administration,Tianjin 300050,China) Abstract: The conventional compaction quality inspection method for highway subgrade primarily relies on random site sampling after compaction,which may not meet the requirements of real-time and continuous quality monitoring during rolling. Moreover,using limited samples to represent the entire working area may often introduce large errors in the compaction quality. With the developed monitoring device for highway subgrade compaction quality,the compaction value (CV) of subgrade can be acquired timely. Basing on the correlation analysis between CV and the elastic modulus (or the compactness of the subgrade soil),a regression model of the compaction quality is established. Furthermore,a fast assessment method on the compaction quality of subgrade is proposed for the entire working area,so that the compaction quality at any location of the working area can be estimated and the qualification rate of the entire working area can be analyzed. Hence,the proposed method may overcome the shortage (such as the insufficiency and the delay) of post sampling,thus providing a new way for real-time quality control of highway subgrade co

文档评论(0)

1亿VIP精品文档

相关文档