大学论文(设计)哈拉沟一矿4.0Mt-a新井设计.docVIP

大学论文(设计)哈拉沟一矿4.0Mt-a新井设计.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
摘 要 本设计是哈拉沟一矿4.0Mt/a新井设计,设计矿井为一井一面的高产高效矿井。哈拉沟一矿位于陕西省榆林市大柳塔镇,交通便利。井田走向长度约5.33km,倾向长读约3.44km,井田总面积为18.34km2。通过对地质资料的深入分析,采用平硐-立井单水平开拓方案。主平硐和副平硐位于井田边界,回风立井位于井田中央,采用中央并列式通风。井田内有三个煤层,且间距适中,煤层倾角平均1°左右。根据煤层赋存条件和井田地质构造特点,采用分煤层大巷布置,每个煤层都布置三条大巷。采煤方法采用走向长壁采煤法。井田划分为四个盘区。矿井年工作日为330d,工作制度为“三八”制。 全矿分为四个盘区。盘区采用双巷掘进。为了尽可能地实现集约生产,采用一井一面的高效矿井模式。在设计中,采用了综采综掘等先进工艺和技术。这不仅提高了煤炭的开采和掘进效率,而且减小了建井工期和初期投资。运煤主要采用皮带运输,同时使用无轨胶轮车进行辅助运输,使整个运输系统更高效,更安全。 The design is the new mine design of Halagou No.1 mine with capability of 4.0Mt/a , and it is a high production and high efficiency mine with one production and one mining face. Halagou No.1 mine located in Yulin City, Shanxi Province, Daliuta town. The traffic of the road and railway is very convenience to the mine.The run of the minefield is 5.33 km ,the width is about 3.44 km,mine farmland total area is 18.34㎞2.Through an in-depth analysis of geological data, the development of adit-shaft with single level is adopted. Main adit, auxiliary adit are located in the boundary of the minefield, and air shaft located in the central.The central parallel ventilation is used.There are three coal seams in the mine field, and the spacing among them is moderate and the average dip of coal seam is about 1°. According to the coal seams deposit conditions and mine field geological structure characteristics, the coal seam roadways are used and layout of each seam is three roadways. Coal mining methods are the strike longwall mining method. The working system “three-eight” is used in the mine. It produced 330d/a. The whole mine field is divided into four panel section. In the panel section,double lane tunnel along gob are used. In the design,in order to realize centralized production ,the pattern of high-output- and– high-efficiency mine with one producing adit and one mining face are applied. During the design, the advanced technologies and techniques such as fully mechanized mining and fully mechanized tunneling are used.It is not only improve the efficiency of

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档