盾构始发台车宽度与车站净空冲突解决措施

盾构始发台车宽度与车站净空冲突解决措施   摘要:通过对广州地铁三号线北延段燕塘站~梅花园站区间施工中,盾构始发时遇台车宽度与车站净空发生冲突案例的分析、解决,探讨城市轨道交通盾构施工中类似问题的解决措施,为后续类似工程设计及施工起到一定的借鉴与指导作用。   关键词:盾构机台车净空弯轨偏移   中图分类号: F540.3文献标识码:文章编号:      Abstract: Pass to the three Guangzhou subway numbers lines north postpone Yu trolley width and the station headroom conflict case analysis happened , solve in Duan swallow pond station ~ plum garden station siding-to-siding block construction, when shield structure begins getting rich, discuss city orbit traffic shield structure being under construction being hit by the similar problems resolving measure , be fo