土门子水库溢流坝面翻模施工的方案    摘要:土门子水库溢流坝面采用上翻模施工工艺,施工主要特点是施工便捷、经济实惠、不易出现质量缺陷。翻模施工时,注意掌握好翻模时间,进行抹面,控制好砼的入仓强度,保证砼浇筑时不扰动成型的砼。   关键词:溢流坝、翻模施工、模板技术   Abstract: the reservoir spillway Tumenzi by over-form construction technology, construction is the main characteristics of construction convenient, affordable, not easy to have quality defects. Rollover construction, grasp the turning model of time, finishing, control the concrete placing strength, ensure the concrete pouring without perturbation of molded concrete.   Key words: overflow, over-form construction, template technology   中图分类号:TV62文献标识码:A 文章