悬臂法连续梁“零号段”施工控制的要点
悬臂法连续梁“零号段”施工控制的要点
摘要:在跨太长高速公路48+80+48m连续梁挂篮施工中,零号段作为整个连续梁受力最繁琐,结构最复杂,施工难度最大的节段,在此简要介绍了悬臂法连续梁的“零号段”施工过程,重点介绍了容易产生误差、引起外观和质量问题的注意事项,并提出了连续梁悬臂施工中的几点可行性控制方法。
关键词:悬臂法 连续梁零号段 支架临时锚固预应力钢筋 张拉 压浆
Abstract: the cross is too long highway 48 + 80 + 48 m continuous beam guyed travelers, zero HaoDuan as the continuous beam force most trival, most complicated structure, and construction as the most difficult section, in this briefly introduced the cantilever method of continuous beam zero HaoDuan construction process, focusing on the easy to produce the error, the appearance and quality problems c