- 16
- 0
- 约1.04万字
- 约 10页
- 2018-11-16 发布于江苏
- 举报
混凝土喷射机详细说明书
中国矿业大学2007届本科生毕业设计 第 PAGE 73页
Where , is the length of bolted end ; is the length of outer part.
Bolt spacing a can be derived by the criteria that no slip occurs along bedding planes. Besides the above-mentioned conditions, the safety of the combined beam must be checked to prevent it from longitudinal instability.
When all the conditions are satisfied, roof bolt parameters can ready be determined. As for sidewall bolts, their length and spacing can be derived by soil bracing theory in soil mechanics.
It should be noticed when roof is composed of weak and loose strata, some bracing measures must be taken to protect the integrity of the fragile roof.
Bolting of the gateway and its assessment
Support assessment by discrete element method
We consider two case in order to compare , first
case: only the roof is bolted; second case: both roof and sidewall are bolted.
Having been bolted in the first case, the roof has a obvious higher stiffness and strength, in the initial stage, only slight deflection occurs. However, with the sidewall coal failing and caving, the free span of the roof increases, the roof gradually enters unstable stage, subsiding and bedding separating as shown in Fig.5. Compared with the unsupported gateway, the gateway with roof bolted can keep stability for much longer time even it destabilizes finally.
In the second case, the sidewall coal deformation and failure are strictly controlled by the sidewall bolts, the sidewalls are stable. Roof deflects only a small amount. Displacement can be hardly seen in the block diagram(Fig.6).
The overall surrounding strata are in stable conditions. Even influenced by mining activity the gateway only fails locally, the roof is, however rather stable. It is, thus important to adopt a comprehensive bolt support pattern including the sidewalls.
Bolting scheme and its implementation
Based on the inclined combined beam theory, gateway loosed zone measurement a
您可能关注的文档
最近下载
- 以工代赈40年:演进历程、政策逻辑与未来展望.pdf VIP
- (反光)灯槽(走廊天花)安装施工方案及技术措施.docx VIP
- 地下车库环氧地坪施工安全方案.docx VIP
- 基于人工智能的区域教育质量监测:数据质量控制与评估体系构建教学研究课题报告.docx
- 美国民事没收面临的违反正当程序的抗辩.doc VIP
- 美国民事没收无辜所有者抗辩:历史、现状与启示.doc VIP
- 全国职业大赛(中职)ZZ012食品药品检验赛项赛题库共计10套.docx
- 墙体加固设计与施工方案.docx VIP
- NYT1117-2010 水溶肥料钙、镁、硫、氯含量的测定.pdf VIP
- 1MD-HPV-20150304-01 HPV检测临床关注的问题.ppt VIP
原创力文档

文档评论(0)