中国铁路治沙情况综述教学材料.pptVIP

  • 5
  • 0
  • 约4.47千字
  • 约 69页
  • 2018-10-17 发布于天津
  • 举报
中国铁路治沙情况综述教学材料.ppt

中国铁路治沙情况综述 THE SYNOPSIS OF RAILWAY SAND CONTROL IN CHINA;塔克拉玛干沙漠是世界上第二大移动性沙漠,1996年,中国建成了穿越该沙漠的世界上最长的沙漠公路。这条公路是为了运输塔里木盆地的石油、天然气,发展中国西北经济而修建的。Taklimakan Desert is the second largest moving desert in the world. In 1996, China completed the 522-km Taklimakan desert road, which is the longest road of its kind running through a desert. It is playing an important role for the transportation of petroleum and gas from Tarim Basin and for promoting economic development in the northwest part of China. ;中国政府已经决定分三步,为这条沙漠公路修建绿化带。China has kicked off a three-phase project to build a green belt for this ro

文档评论(0)

1亿VIP精品文档

相关文档