吴四圪堵煤矿WN综放面搬家施工技术方案

吴四圪堵煤矿WN62综放面搬家施工方案     目 录   一、WN62综放面、WN63综放面概况························3   二、搬家组织机构·······································4   三、搬家材料、配件、设备 准备··························4   四、搬家人员组织·······································4   五、特种车辆配备·······································5   六、工期安排···········································5 七、末采挂网及主回撤通道施工·······················5 八、回撤/安装工期安排·································5   九、WN62综放面回撤····································9   十、WN62综放面安装···································11   十一、皮带运输大巷皮带安装····························12   十二、WN62综放面搬家一通三防及防排水·················1