地下水电站除湿机的除湿效果与设计方法-供热、供燃气、通风及空调工程专业论文
西安建筑科技大学硕士学位论文
西安建筑科技大学硕士学位论文
西安建筑科技大学硕士学位论文
西安建筑科技大学硕士学位论文
万方数据
万方数据
万方数据
万方数据
The Underground Power Station Dehumidifier Effect and Design Method
Major:Heating, Ventilation and Air-Conditioning
Author: Du Wei
Supervisor:Professor An-gui Li
ABSTRACT
The construction of hydropower plant has been developed rapidly during the last decade, due to the government encouragement of exploiting hydroelectric resource. Under the consideration of topography conditions and other limits, underground power-house turns to be the first choice for the existing large hydropower stations, as well as many under-construction or proposed hydro-electric projects. Generally, the location of power station is deeply beneath the surface, with no direct sunlight and the surface of enclosures retains wet all the year round. Thus, the culating air relative humidity is quite high. Moreover, the values of relative humidity in turbine layer and volute layer even exceed 90%, which contribute to the frequency of dew formation. The wet ambient will not only affects the service life of electrical equipment, but also poses health risks.
In this paper, we offer a probing theoretical study about the wet condition of the underground power plant, and then a field test as well as detailed numerical simulation of heat and humid environment in summer of Huizhou is conducted. Furthermore, an analysis for the operation problem existed in dehumidifier is given. The author attains the effective dehumidification radius and the range of effective dehumidification by contrasting heat and humid environment of plant A and B in Huizhou pumped storage power (the installed capacity and cavern structure of plant A and B are exactly the same, except that plant B installed thirteen dehumidifiers, while plant A installed none). Finally, a rational design methodology and arrangement guideline for dehumidifier in underground power-house is recommended.
Keywords: Pumped Storage Power Station, Dehumidification, Numerical Simulati
您可能关注的文档
- 分裂可行问题及其拓展问题的算法研究-数学;运筹学与控制论专业论文.docx
- 分词语料库中四字格的切分和识别研究-语言学及应用语言学专业论文.docx
- 分裂可行问题的投影算法研究-应用数学专业论文.docx
- 分裂可行问题的若干投影算法研究-应用数学专业论文.docx
- 分词技术在异构数据统一检索中的研究及应用-计算机软件与理论专业论文.docx
- 分配器耐压试验台的研究与设计-机械设计及理论专业论文.docx
- 分部信息呈报的会计研究 会计学专业论文.docx
- 分配对象和情境类型及移情能力对幼儿公平分配行为的影响-发展与教育心理学专业论文.docx
- 分配格上矩阵的特征向量的求解方法-应用数学专业论文.docx
- 分配正义理论研究——以罗尔斯、诺齐克、丹尼尔斯为代表-哲学伦理学专业论文.docx
文档评论(0)