2017美赛题目.docxVIP

  • 32
  • 0
  • 约1.6万字
  • 约 12页
  • 2018-12-12 发布于河北
  • 举报
2017美赛题目

PROBLEM A:?Managing The Zambezi River The Kariba Dam on the Zambezi River is one of the larger dams in Africa. Its construction was controversial, and a 2015 report by the Institute of Risk Management of South Africa included a warning that the dam is in dire need of maintenance. A number of options are available to the Zambezi River Authority (ZRA) that might address the situation. Three options in particular are of interest to ZRA: (Option 1) Repairing the existing Kariba Dam, (Option 2) Rebuilding the existing Kariba Dam, or (Option 3) Removing the Kariba Dam and replacing it with a series

文档评论(0)

1亿VIP精品文档

相关文档