土建基础施工方案.doc

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PAGE 38 基础施工方案 日 期: 年 月 日 PAGE \* MERGEFORMAT 3 PAGE \* MERGEFORMAT 3 目 录 一、工程概况················································1 二、编制依据················································2 三、施工部署与进度计划······································2 四、机械及劳动力计划········································2 五、施工工艺················································3 5.1基坑施工安全措施·········································3 5.2地下管线保护措施·········································4 5.3破桩头工艺···············································4 5.4基础工程·················································5 5.5测量放线·················································6 5.6钢筋工程·················································6 5.7混凝土工程···············································17 5.8模板工程·················································30 六、砌筑工程·················································33 七、屋面工程·················································37 八、质量控制点及控制方法·····································41 九、安全消防措施·············································42 十、安全文明施工···········································42 十一、高空安全作业规程·······································45 十二、现场安全生产工作规定···································46 一、工程概况 原有路面、地面及基础需破除,根据图纸土方开挖时高度不超2m,无需进行支护。场地四周搭设临时施工围挡,以免对周边造成影响。 土层的分布及承载力情况 1.杂土层:含碎石、炉渣、煤面(渣)等、土质松散,不均匀。厚度0.7-4.8,平均厚度2.45m。 2.粉质粘土:厚度一般0.5-3.9m,平均厚度1.92m。侧阻=55和65Kpa。 3.淤泥质粉质粘土:厚度一般5.5-10.9m,平均厚度8.8m。侧阻=18和25Kpa。 4.粉质粘土:厚度一般1.4-7m,平均厚度4.77m。侧阻=45和60Kpa。 5.粉质粘土:厚度一般3-6.6m,平均厚度4.57m。侧阻=60和75Kpa、端阻=900和2600Kpa。 6.粉质粘土:厚度一般4.4-9.8m,平均厚度6.84m。侧阻=55和70Kpa、端阻=800和2400Kpa。 7.粉土、粉砂组成:厚度一般0.7-12.9m,平均厚度10.12m。侧阻=80和85Kpa、端阻=1000和4000Kpa。 8.粉质粘土:勘侧未穿过该层。灌注桩和PHC桩侧阻力、端助力标准值未给定。 9.地下水位埋藏较浅,长期受电厂水工建筑及管道渗漏补给,可按0.5m考虑。地下水对混凝土结构弱腐蚀性,对钢结构有中等腐蚀性。标准冻结深度为0.6m。 10.钢筋直径12一下为HPB300,钢筋直径12以上为HRB300、HRB400,混凝土强度等级:基础垫层为C15,基础为C30。 11.1)废水楼基础采用灌注桩,直径800mm钻孔灌注桩,桩长约8根31m、2根17m,桩端持力层为④3粉土、粉砂层,单桩竖向抗压极限承载力为2400kN、1000 kN。 2)澄清浓缩器基础采用灌注桩,直径600mm钻孔灌注桩,桩长约9根18.5m,桩端持力层为④3粉土、粉砂层,单桩竖向抗压极限承载力为830kN。 二、编制依据

文档评论(0)

Forever + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档