- 31
- 0
- 约8.17千字
- 约 5页
- 2019-01-05 发布于四川
- 举报
引用信息:原载于《中国国土资源经济》2017 年第9 期第63-65 页
地质勘查项目经费审计难点与管理对策
1
姚桂霞 ,陈 杨
(中国国土资源航空物探遥感中心,北京100083)
摘要:针对地质勘查活动工作场所的流动性、工作时间的弹性、地质工程的隐蔽性,本研
究梳理了地质勘查项目在工程施工费、野外工作津贴和劳务费使用管理方面存在的问题和审
计的难点,包括工程施工中土石方量难以计量、野外工作时间难以确认、劳务用工真实性难
以核实等。综合运用预算对比法、野外工作日志审查法、询问雇用人员等审计方法,能化解
地质勘查项目经费审计的难点。从审计工作的角度,提出了加强地质勘查项目经费管理的相
关建议:加强项目经费预算管理,加强地质勘查项目合同的统一管理和加强单位款项支付的
管理。
关键词:地质勘查;项目经费;审计方法
中图分类号:F407.1;F062.1 文献标识码:A 文章编号:1672-6995(2017)09-0000-00
Difficulties in Audit of Geological Prospecting Projects and
Management Countermeasures
YAO Guixia, CHEN Yang
(China Aero Geophysical Survey and Remote Sensing Center for Land and Resources, Beijing
100083, China)
Abstract: In view of the mobility of workplaces, the elasticity of working hours and the
concealment of geological engineering in geological prospecting activities, this study sort out
the problems and audit difficulties of geological prospecting projects in engineering construction
fees, field work allowance and labor service fee management. For example, the soil and stone
volume is difficult to measure, the working hours in field are difficult to confirm, and the
authenticity of labor service is difficult to verify and so on. The audit methods like budget
comparison, field work log review, asking the employee and others can be used comprehensively
to resolve the audit difficulties of geological prospecting project funding. From the perspective of
audit work, the paper puts forward some suggestions on how to strengthen the funding
management of geological prospecting projects: strengthen the budget management, the unified
contract management and the payment management.
Key words: geologic
您可能关注的文档
最近下载
- 手术室护士的职业暴露与防护课件.pptx VIP
- 机械工程测试技术基础的期末考题及答案.docx VIP
- 药店医疗器械质量管理制度.docx VIP
- 高二物理电场综合测试练习试卷及答案.doc VIP
- (2023春)大象版六年级科学下册全册教案(教学设计).doc
- 社区获得性肺炎重症的护理查房.pptx VIP
- 高考物理复习《带电粒子在电场中的力电综合问题》强化练习含答案.pdf VIP
- 广告牌安装安全协议书范本(标准版).doc VIP
- 湖北省武汉市东湖新技术开发区 2024-2025学年七年级上学期期末道德与法治试卷.docx VIP
- 宝胜电缆中英文对照样本Product-Catalogue.pdf VIP
原创力文档

文档评论(0)