- 5
- 0
- 约1.16千字
- 约 21页
- 2019-01-19 发布于江苏
- 举报
塑胶零件DFM讨报告(方案成熟阶段) 2013英文版
Project name, part name;Summary of opening critical issues ;;4: Output—molding study; A: Geometry received (updated 3D)
product overview (size appearance, features);Input; B: Material selection for this part ;C: Visual surfaces’ requirement;Input;Proposal agreed by;Proposal agreed by;Proposal agreed by;E4: Conclusion about current wall thickness design;F1: proposed sequence of surfaces’ released
(including proposed parting lines.);f1.1: (output detail);F2: proposed sequence of surfaces’ closing;Proposal agreed by;agreed by;This report should not be used accordingly for mold makin
您可能关注的文档
最近下载
- 2026年通信工程师《通信伦理》真题卷.doc VIP
- 孙宇晨小作文全文.docx VIP
- 一家三口共用奶奶.docx VIP
- 六年级上册语文《1-8单元园词句段运用知识点》.docx VIP
- 河池市农村建设用地整治潜力研究.pdf VIP
- GB50273-2022 锅炉安装工程施工及验收标准.pdf VIP
- (2026秋新教材)人教版六年级数学上册全册PPT课件.pptx
- 健康管理与临床预防服务(共106张PPT)【106页】.pptx VIP
- 外研版四年级上册英语全册新优质教学课件(配2025年秋改版教材).pptx
- 【GB50273-2022 】锅炉安装工程施工及验收标准.docx VIP
原创力文档

文档评论(0)