测量放样锚杆桩施工工艺流程 Survey setting anchor pile construction process 由于受桥桩空间(最低处净空2. 0 m)及设备本身高度的限制,复合锚杆桩在施工前,先开挖2 m Because of the pile space (the lowest clearance 2 m) and their height limit device, composite bolt pile before construction, the 2 m first excavation 宽、1. 5 m深的基槽(施工完成后回填混凝土,恢复至原地面高程),以加大操作空间,便于施工作业。成孔后竖向锚杆及支撑采用分节连接,每节长2 m,用接驳器连接,地面多余钢筋待施工完成后截除。 1.5 m wide, deep trench (after the completion of construction of concrete, restore to the original ground elevation), in order to increase the operating space, convenient construction operation. After the hole of vertical anchor and supported by the section connection, each section of length 2 m, connected by the connector, ground of excess steel to be after the completion of construction of amputation. (1)施工准备。根据设计要求做好桩位的轴线标记和测量放样,按桩位施工。为了确保锚杆桩的精确定位,需使用特制的定位器进行定位。 (1) the construction preparation. Do the axis marking and measuring the lofting of the pile position according to the design requirements, according to a pile construction. In order to ensure accurate positioning of anchor pile, require special positioner positioning. (2)钻机夯进。采用sh-1030钻机(需对其进行局部改造)冲击、套管跟进成孔。钻机在设计桩位安装就位后,检查冲击杆是否垂直;然后用φ150钻头开口3~4m,下φ127mm套管,螺旋开挖成孔;当套管跟进到设计深度后终孔。 (2) into the drill rammer. Using the sh-1030 drilling rig (for local transformation of its impact, follow-up sleeve hole). Rig in the design of pile position after installation, check the impact rod is vertical; then φ 150 bit opening under 3~4m, 127mm casing, spiral excavation hole; when the casing to the designed depth after the final hole (3)复合锚杆制作和安装。 (3) the production and installation of composite bolt. ①复合锚杆制作。先用3根φ20螺纹钢组成一个钢筋笼。另由φ12钢筋围成一个内径30 mm Production of composite bolt. The first 3 Phi 20 steel is composed of a steel cage. The other by phi 12 steel round into a diameter of 30 mm 的钢筋笼隔离环,纵向每米1环与钢筋及定位支撑焊接。定位支撑由φ18螺纹钢筋弯成宽40 mm,高200 mm的环行。 The reinforcement cage spacer ring, vertical 1 metres per ring and bar and a positioning supporting welding. Positioning is supported by

文档评论(0)

勤能补拙 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档