- 1、本文档共60页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Hand signals you should understand Jib rising: Stretch the arm straightly to one side, thumb up, the rest fingers are clenched, and wave the lower arm upward. Jib lowering: Stretch the arm straightly to one side, thumb down, the rest fingers are clenched, and wave the lower arm downward. Work finished: Stretch both hands fingers, and cross them before your forehead. 您要明白的手势 Hand signals you should understand Slight jib rising: Place one of your lower arms on one side of your chest, stretch the fingers straightly, palm down keep still. The thumb of other hand points to the palm of former hand, the rest fingers are clenched, and moving up and down. Slight jib lowering: Place one of your lower arm on one side of your chest, stretch the fingers straightly, palm up keep still. The thumb of other hand points to the palm of former hand, the rest fingers are clenched, and moving up and down. Grabbing: the two lower arms are placed on front sides, palms face each other and wave from both sides to the middle. 您要明白的手势 Hand signals you should understand Crane slewing: armone arm stretches forward in level, fingers naturally outstretch and keep still. The other repeats horizontal swing before chest. 工作之前要做到 作业类型; 施工地点(距离); 沿途通过高度及道路宽度; 作业上空电线情况(详细的电压值见表1-1); 周围建筑物对作业条件的限制; 提升重物的重量及外形尺寸; 提升及下落高度; 地基的承载能力。 Before working you should learn Work type; Construction site (Distance); The passing height and road width along way; Conditions of power line over the operation zone (Detailed voltage values refer to Table 1-1); Working conditions limit from surrounding buildings ; Weight and sizes of the lifted load; Lifting and falling height; Foundation bearing capacity. 如司机不掌握这些必要的起吊工况,则难以顺利完成作业任务。因此,作业之前,操作者应作好各种准备工作,以防事故发生。 起重臂、重物等与输电线的最小距离 输电线电压V(KV) 1 1~35 ≥60 最小距离(m) 1.5 3 0.01(V-50)+3 If the drivers do not learn these necessary lifting working conditions, it is hard to complete the work successfully. Therefore, before operatio
您可能关注的文档
最近下载
- 《大学之道》《人皆有不忍人之心》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 五年级道德与法治3,主动拒绝烟酒与毒品优秀教案.pdf
- 《美丽的丝巾ppt课件》小学美术浙人美版二年级下册_2.ppt
- 《论语十二章》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 电动单梁起重机设计计算书.doc
- 2069-3-3101-002 WKB产品判定准则-外发.docx
- 露天矿组织架构、部门职责.pdf VIP
- 《数字化测图》课程标准(高职).docx
- 医疗行业医疗设备采购方案.docx VIP
- 朝阳市第四高中诗词大会十二宫格题.ppt
文档评论(0)