大跨径pc连续刚构桥施工监测控制分析建筑与土木工程专业论文

AB AB STRACT Based on the 3群bridge.the span layout:65+3×120+65 m multi span suspension bridge with prestressed concrete continuous rigid flame bridge,combined with the bridge 3 finite element analysis software to calculate and analyze the internal force of the bridge structure and control section.The bridge construction monitoring control means and the hanging basket cantilever construction,combined with the construction phase of the measured parameters of concrete elastic modulus E,pipeline friction coefficient U,pipeline deviation K,the finite element analysis model for real-time dynamic repair.To make sure that the structural alignment and sectional control of the 3≠}bridge in the construction stage of the hanging basket cantilever construction stage shall comply with the requirements of the construction design documents.codes and standards.In this paper,the main research of the 3j|}bridge in Lee’S house is the following: (1)bridge construction monitoring and control is an important part of bridge construction technology.The importance and necessity of the bridge construction monitoring are illustrated by the analysis of the error between the model and the measured data. (2)starting from the construction monitoring scheme of the 3祥bridge,the construction control of the multi span suspension bridge,the construction control method,the construction monitoring principle and the technical process of the construction monitoring.The control method of open loop,closed-loop control method and adaptive control method are analyzed,and the construction monitoring of PC continuous rigid frame bridge should be flexible and changeable. (3)combined with the theory of construction control,the design and calculation of the design and the construction control calculation of the 3群bridge in Lee’S house. Contrast analysis of the control theory,the influence factor,the calculation formula and the setting curve of the pre camber of the opposite mode. (4)for Multi Span Cantilever of P

文档评论(0)

1亿VIP精品文档

相关文档