基于改进雷击跳闸率计算法的输电线路雷击风险评估方法研究-电气工程专业论文.docxVIP

  • 6
  • 0
  • 约6.21万字
  • 约 60页
  • 2019-02-20 发布于上海
  • 举报

基于改进雷击跳闸率计算法的输电线路雷击风险评估方法研究-电气工程专业论文.docx

重庆大学 重庆大学硕士学位论文 英文摘要 PAGE PAGE IV section, then transmission line risk assessment model is established. Then, rank the tower section lightning tripping risk which can be used to determine the weak tower section of transmission line. ④ Lightning risk assessment results of three 110kV、220kV、500kV transmission lines show that this method is more accurate than the risk evaluation method which only using transmission line lightning trip-out rate as the evaluation index. This method can realize the risk assessment from the tower, tower sections to the whole transmission line which has stronger ap