METHOD STATEMENT FOR PAVEMENT WORKS(路面施工方案英文版).docxVIP

METHOD STATEMENT FOR PAVEMENT WORKS(路面施工方案英文版).docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Page PAGE \* MERGEFORMAT 29 of 31 Revision 0 METHOD STATEMENT FOR KERBING WORKS, FOOT PATHS AND PAVED AREAS TABLE OF CONTENTS S.No Description Page No 1. Scope 3 2. Permits and Licenses 3 3. Methodology (Sequence of Work For Kerbing Works, Foot Paths and paved Areas ) 3 4. Health and Safety 16 5. Risk Assessment 21 6. Environment Control 24 7. Inspection and Testing 24 8. Supervision Responsibilities 25 9. Resources 25 10. Drawings and Sketches 26 11. Reference Documentation 26 12. Attachments 26 1.0 SCOPE The purpose of this Method Statement is to describe the Methodology involved in construction of Kerbing Works , Foot paths and paved areas in accordance with project technical specifications, international standards and codes, local rules and regulations (QCS-2010). This method statement will cover the following works: Precast concrete paving blocks Concrete kerbs unitWorks Asphalt Works 2.0 PERMITS AND LICENSES The Permits and License required for commencement of the work shall be obtained prior starting any site activities, the permits and license shall be obtained from the Following: KAHRAMAA Ooredoo Qatar Municipality Ministry of Environment Public Work Authority 3.0 SEQUENCE OF WORK FOR KERBING, FOOT PATHS AND PAVED AREA 3.1 Concrete Works 3.1.1 General The following are the types of precast kerbs to be constructed where designated together with associated channels, edgings and quadrants: (a) Non-mountable. (b) Dropped. (c) Flush. The dimensions and shapes of the different kerb types shall be as per the details in BS EN 1340 unless otherwise shown on the drawings or designated in the contract. The bedding and support for such units shall be as shown on the drawings. Except as modified in this Part, all precast concrete kerbs, channels, edgings and quadrantsshall be hydraulically pressed complying with BS EN 1340. Kerbs shall be laid and bedded in accordance with BS 7533 on the concrete pavement slab, a mortar bed, the road base, or on a concrete fo

文档评论(0)

annylsq + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档