DOI:10.13731/j.issn.1000-4726.2017.06.014
48 6 2017 6
Vol.48 No.6 Jun. 2017 Architecture Technology 613
1000015
14
TU 94 B
1000 4726(2017)06 0613 04
TUNNEL-AHEAD AND STATION-FOLLOWING CONSTRUCTION
TECHNIQUE FOR SUBWAY STATION
(BCEG Civil Engineering Co., Ltd., 100015, Beijing, China)
Abstract: The Jingshunlu Station of Beijing Subway Line 14 is an open-excavated station, whose
south end is shield interval. The conventional method which finishing station construction before shield
arrival could not be used due to adjustment of station position and delayed early work. Combined
ground and in-pit strengthening measures were adopted to solve the soil instability and water leakage
problems around tube piece. Optimum design and construction control were carried out to guarantee
station foundation pit safety, and relevant construction problems were discussed. This project provided
certain references for similar projects in Beijing and other regions of China.
Keywords: subway station; tunnel-ahead and station-following; shield arrival
14 5.651~7.698 m21.931 m
2
12 750 m
1 10 m
5
您可能关注的文档
- 2018年第4期盾构与掘进.pdf
- AQ-14安全文明施工标准化图册11.23.pdf
- DZ188土压平衡盾构机使用维护手册.pdf
- ZTE6250盾构机常见故障及改进措施---史世蕾.ppt
- 城市轨道交通工程现场管理标准化图册-1110-4.docx
- 城市地铁盾构施工事故案例.pdf
- 大粒径富水砂卵石地层泥水盾构刀盘脱困技术_汪辉武.pdf
- 大型泥水平衡盾构机接管器系统.pdf
- 地铁三号线盾构隧道工程施工技术研究(1-180).pdf
- 地铁三号线盾构隧道工程施工技术研究(181-366).pdf
- 2025广东广州市天河区拟招聘英语实习老师1人备考题库附答案.docx
- 2025广东广州市天河区城市管理第二保洁所招聘编外工作人员4人笔试备考试卷附答案解析.docx
- 2025广东广州市越秀区流花街道办事处招聘综合事务中心辅助人员1人笔试历年题库附答案解析.docx
- 2025广东广州市花都区新雅街清初级中学招聘临聘教师1人备考历年题库带答案解析.docx
- 2025广东广州市天河区城市管理第二保洁所招聘编外工作人员4人笔试备考试卷带答案解析.docx
- 江苏省盐城市东台市三仓镇区中学2026届八年级数学第一学期期末教学质量检测试题含解析.doc
- 2025广东广州市天河区城市管理第二保洁所招聘编外工作人员4人备考题库带答案解析.docx
- 江苏省盐城市亭湖区2026届数学八上期末考试试题含解析.doc
- 安徽省蚌埠市淮上区2026届数学八年级第一学期期末达标检测模拟试题含解析.doc
- 2025广东广湛城旅游轮有限公司招聘备考历年题库附答案解析.docx
原创力文档

文档评论(0)