国际水电EPC项目风险评价及控制研究-水利水电建设工程管理专业论文.docxVIP

国际水电EPC项目风险评价及控制研究-水利水电建设工程管理专业论文.docx

  1. 1、本文档共79页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3 3 Abstact Titel: THE EVALUATION AND CONTROL OF THE RISK OF THE INTERNATIONAL HYDROPOWER EPC PROJECT Major: Water conservancy and hydropower construction project management Name: Xiaomeng Ma Signature: Supervisor: Professor Bin Ma Signature: Associate professor Jiwei Zhu Signature: Abstract Day by day strengthens along with the economic globalization, more and more Chinese engineering contracting enterprises go abroad, towards the international project contracting market.Compared with the domestic engineering,international engineering contract amount is huge, long project cycle, complex management, make the international engineering contracting at high risk.Higher risk in the international engineering make practice in the field of international engineering contract risk management will become a trend.In international engineering general contracting market, EPC general contracting is a major contract mode, this mode, the owner does not participate in the project management, general contractor need to take more responsibility.For engineering company in China, making international EPC project risk evaluation and control is the enterprise the key to remain competitive in the international market, has important practical significance.Therefore, from the Angle of the EPC contractor for risk assessment and control research is necessary. In this paper, based on the analysis on the current situation in the international contracting market,the writer summarized the international general contracting enterprise of the development status and existing problems, in view of the high risk of international engineering project,the author put forward the international engineering general contracting risk evaluation. Risking index system is established, and the del west hydropower station as an example for the risk assessment and control.This article main research results are as follows: Established the international hydropower EPC project risk evaluation index system.

您可能关注的文档

文档评论(0)

1234554321 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档