英文版锚索施工方案Method Statement for Removable Ground Anchor.pdfVIP

英文版锚索施工方案Method Statement for Removable Ground Anchor.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Method Statement for Removable Ground Anchor 1. Introduction In general, the excavation soil retaining system consists of CBP pile and struts. At certain locations of the CPB Wall, ground anchors are proposed. The Ground Anchor will need to be removed. This report provides the installation and removal procedures for the ground anchors. 2. Equipment Set-up i. Grouting Plant The grouting plant shall be located at suitable area in order to facilitate the grouting works. Consideration also has to be given to the supply of cement so that the storage area of the cement is near to the grouting plant. Access for the delivery of the cement has to be taken into account in order to avoid traffic problem on site, especially if the site is congested and a lot of other trades are on-going. ii. Water Supply Clean water supply free of oil contaminants is essential in the mixing of cement grout. Additionally, adequate water supply has to be provided for the drilling of ground anchors. iii. Fabrication Yard It is preferred that an area for the fabrication of the anchor tendons is identified on site. The area is to be free of any ponding or flooding of water due to heavy downpour. 3. Drilling Works Once the CBP pile has been completed for the anchor location, the drilling works shall commence. The installation of the ground anchors shall be done either with or without temporary casing depending on the suitability of the ground conditions. Should pressure grouting of the borehole be required to enhance skin friction, casing will be required. It is proposed to start the borehole with 170mm diameter drilling bit, and end the borehole with 165mm diameter drilling bit. The drilled angle will be 25 degree. Drilling of ground anchors shall be performed either with rotary or percussive method. Drilling f

文档评论(0)

annylsq + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档