摘 要
Abstract
Graduating the design is a tender which according to 某某community allocation floor project tender document bid notice, the condition of contract, the technology standard, the blueprint and other related documents establishes.
The design includes:Business Standard,technical standards and conclusions. Business Standard,including civil engineering,decoration,installation,and integrated unit of analysis; Calculation rules for construction in strict accordance with Application of Shandong Province fixed works in the calculation rules to calculate project cost is the application of a fixed set of prices,in strict accordance with Shandong Province valuation norms. Technology standard is from the human,material,machine area to carry out a comprehensive layout of construction,including the preparation of the basis for project overview,construction overall plan,construction preparation work,the main branch (sub-) construction method to ensure the quality of the technical organization measures to ensure the safety measures of technical organizations,to ensure that the construction of technical civilizations organizational measures,product protection, reducing noise pollution and measures to ensure the construction period measures of technical organizations,winter construction measures,quality problems of the prevention measures,with photos List ,from a technical,construction,materials and adopt measures to ensure that the construction of the construction schedule,quality and construction safety,and on this basis,a reasonable lower the cost of construction.
KEY WORDS:目 录
摘 要 I
Abstract II
上篇 商务标部分 1
第1章 总论 2
1.1 投标总价 2
1.2 总说明 3
1.3 工程项目投标报价汇总表 4
1.4 单项工程投标报价汇总表 5
1.5 单位工程汇总表 6
第2章 土建部分 7
2.1 分部分项工程量清单与计价表 7
2.2 工程量清单综合单价分析表 10
2.3 措施项目清单与计价表(一) 35
2.4 措施项目清单与计价表(二) 36
2.5 其他项目清单与计价汇总表 37
2.6 规费、税金项目清单与计价表 38
2.7 工程量计算书明细表 39
第3章 装饰部分 41
3.1 分部分项工程量清单与计价表 41
3.2 工程量清单综合单价分析表 44
3.3 措施项目清单与计价表(一) 62
3.4 措施项目清单与计价表(二) 63
3.5 其他项目清单与计价汇总表 64
3.6 规费、税金项目清单与计价表