Force Majeure ;Force Majeure ;Part1
含义;;Force majeure force majeure in international trade implications and it is called is not uniform.?In common law, there is frustration (Frustration of Contract) principles prescribed.?In civil law countries the law, there are provisions of the so-called change of circumstances or contract failure in principle.;
When it comes to the force majeure, what do you think of?
;;Part2 Define the scope of force majeure events ;In general, the natural phenomena and the war, serious unrest in the countries is the same as a force majeure event, and artificial barriers to the outside of these events, such as government intervention, not licensing, strikes, market volatility, often classified as a force majeure event caused controversy.; 一般来说,把自然现象及战争、严重的动乱看成不可抗力事件各国是一致的,而对于上述以外的人为障碍,如政府干预、罢工等行为归人不可抗力事件常引发争议。因此,当事人在签订合同时应具体约定不可抗力的范围。;Part3 Several provisions of the scope of force majeure event method;(2) enumerated
Set out in the contract, force majeure events, Whatever happened to the events listed in the contract or constitute a force majeure, is no.
such enumerate ways, though clear and specific, but the text cumbersome and omissions may occur, therefore, is not the best approach.
(3) Mixed
Force majeure event may occur frequently stated (such as war, floods, earthquakes, fire, etc.) at the same time, coupled with the force majeure events and other mutually agreed upon, Not only summarized the specific meaning of force majeure in the contract, and belong to the force majeure event
Such provisions ways both clear and specific, but also some flexibility is a desirable approach. In China import and export contracts, in general, have taken such a provision approach.;不可抗力事件范围的几种规定方法
(1)概括规定
在合同中,只是笼统的规定:“由于公认的不可抗力的原因,致使卖方不能交货或延期交货,卖方不负责任”或“由于不可抗力事件使合同不能履行,发生事件的一方可据此免除责任”。
因为这类规定办法,过于笼统,含义模糊,届时伸缩性大,容易引起争议,所以我们不宜采用。
(2)具体规定
在合同中一一列举不可抗力事件的办法,凡是发生???合同中罗列的事件即构成不可抗力,没有?则不构成。
??这类规定办法,虽然明确具体,但文字繁琐,且可能出现遗漏情况,因此,也不是最好的规定方法。
(3)
您可能关注的文档
最近下载
- 餐饮服务中餐宴会摆台理论知识题库(1).docx VIP
- 卓越绩效培训——自我评价和自评报告.ppt VIP
- 智能快递柜安装可行性方案.pptx
- (小升初分班)2024年浙江省小升初数学分班考试真题重组卷(一)含答案.pdf
- 精编版最新版-低压电工培训教材(年).pdf
- 商混站、煤场公司2018年重污染天气“一企一策”应急预案.pdf
- 个人征信报告模板征信报告模板(2021简版带水印).docx
- 部编版语文四年级下册第一单元教材解读大单元集体备课1.0版.pptx VIP
- 建设方建立保障建筑工人工资支付协调机制.docx VIP
- 第5课《和大家在一起》教学设计 2025统编版道德与法治一年级下册.pdf
文档评论(0)