Applicability of 4D CAD in Civil Engineering Construction Case Study of a Cable-Stayed Bridge Project:4D CAD在土木工程施工中的应用.pdfVIP

Applicability of 4D CAD in Civil Engineering Construction Case Study of a Cable-Stayed Bridge Project:4D CAD在土木工程施工中的应用.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CASE STUDIES Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project 1 2 3 4 Changyoon Kim ; Hyoungkwan Kim ; Taekwun Park ; and Moon Kyum Kim Abstract: Four-dimensional 4D computer-aided design CAD has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein. DOI: 10.1061/ASCECP.1943-5487.0000074 CE Database subject headings: Bridges, cable-stayed; Construction; Computer aided design; Case studies. Author keywords: 4D CAD; Cable-stayed bridge; Civil engineering construction. Introduction major 4D CAD applications has been to improve the traditional scheduling methods. Koo and Fischer 2000 applied 4D CAD

您可能关注的文档

文档评论(0)

sunache + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档