- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PAGE 25
84812
84812
Liaoning Third Medium Cities Infrastructure Project Procurement Plan
General
Project information:
Country: The People’s Republic of China
Borrower: The People’s Republic of China
Project Name: Liaoning Third Medium Cities Infrastructure Project
Loan Number: 7524-CHA
Project Implementing Agency (PIA): Liaoning Foreign Fund Utilization Project Office
Bank’s approval Date of the procurement Plan [Previous Version: Jan 29, 2013, Updated Version: Jan 26, 2014]
Date of General Procurement Notice: Jan. 4, 2008
Period covered by this procurement plan: 2014
Procurement Packages with Methods and Time Schedule
Bo.
Contract/ Package
Contract Description
Contract
Number
Contract
Type
Proc.
Method
Prior-or Post-
review
Bidding period
Prequalifi
cation
Period of Implementation
Total Cost
Million $
Total Cost
Million RMB
Actual Contract Value (RMB)
A1
Yingkou Dashiqiao Heating
Civil Works
1
Primary network/substations of Central Heat Source
Pre-insulated pipe DN25- 900mm29900m; 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations
Pre-insulated pipe DN200- 300mm5033m; 27substations (0.0023-0.3537 million m2 heating area)
YKDHC-1
C
NCB
Prior review
Mar .to June 2008
(Completed)
No
July to Novt.2008
5.405
45,683,288.69
2
Central Heat Source Plant
4×64 MW heat source plant
YKDHC-2
C
NCB
Prior review
Mar. to June. 2008
(Completed)
No
July to Oct.2008
4.936
43,987,879
Equipments/Material
3
Substation Equipment and Installation
43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations; heat exchanger, pump, water treatment, heat meter and installation electric and auto-control equipment and installation.
YKDHG-1
S+I
ICB
Prior review
Mar. to June 2008
(Completed)
No
July. to Nov. 2008
3.777
32,000,000
4
Central Heat Source Plant
installation 4×64 MW boilers, auxiliary equipment electric and auto-control equipment
YKDHG-2
S+I
ICB
Prior review
Mar. to July. 2008
(Completed)
No
A
您可能关注的文档
最近下载
- 国开2025年秋《农业推广》形成性考核1-3答案.docx
- 第七章_金属和半导体的接触.ppt
- 会计学课程设计报告会计学课程设计报告.doc VIP
- 6投资领域统计工作业务竞赛试题库.doc VIP
- 老年人运动能力下降多学科决策共识解读(2024版)PPT课件.pptx VIP
- GW-19CP.0011金风GWH 171-5.3 V11R01C100 机组产品说明书.pdf VIP
- 【MOOC】《中国马克思主义与当代》(北京科技大学)中国大学MOOC慕课答案.docx VIP
- 《数星星的孩子》课件.pptx VIP
- 【苏教版】六年级上册数学试题-计算能力训练六 .docx VIP
- ocean培训petrel re快速入门工作流程.pdf VIP
文档评论(0)