世行贷款辽宁中等城基础设施项目-WorldBankDocuments.DOCVIP

世行贷款辽宁中等城基础设施项目-WorldBankDocuments.DOC

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PAGE 25 84812 84812 Liaoning Third Medium Cities Infrastructure Project Procurement Plan General Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Liaoning Third Medium Cities Infrastructure Project Loan Number: 7524-CHA Project Implementing Agency (PIA): Liaoning Foreign Fund Utilization Project Office Bank’s approval Date of the procurement Plan [Previous Version: Jan 29, 2013, Updated Version: Jan 26, 2014] Date of General Procurement Notice: Jan. 4, 2008 Period covered by this procurement plan: 2014 Procurement Packages with Methods and Time Schedule Bo. Contract/ Package Contract Description Contract Number Contract Type Proc. Method Prior-or Post- review Bidding period Prequalifi cation Period of Implementation Total Cost Million $ Total Cost Million RMB Actual Contract Value (RMB) A1 Yingkou Dashiqiao Heating Civil Works 1 Primary network/substations of Central Heat Source Pre-insulated pipe DN25- 900mm29900m; 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations Pre-insulated pipe DN200- 300mm5033m; 27substations (0.0023-0.3537 million m2 heating area) YKDHC-1 C NCB Prior review Mar .to June 2008 (Completed) No July to Novt.2008 5.405 45,683,288.69 2 Central Heat Source Plant 4×64 MW heat source plant YKDHC-2 C NCB Prior review Mar. to June. 2008 (Completed) No July to Oct.2008 4.936 43,987,879 Equipments/Material 3 Substation Equipment and Installation 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations; heat exchanger, pump, water treatment, heat meter and installation electric and auto-control equipment and installation. YKDHG-1 S+I ICB Prior review Mar. to June 2008 (Completed) No July. to Nov. 2008 3.777 32,000,000 4 Central Heat Source Plant installation 4×64 MW boilers, auxiliary equipment electric and auto-control equipment YKDHG-2 S+I ICB Prior review Mar. to July. 2008 (Completed) No A

文档评论(0)

suijiazhuang1 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档