塑胶零件dfm检讨报告(方案成熟阶段) 2013英文版精编版.pptxVIP

  • 1
  • 0
  • 约1.16千字
  • 约 21页
  • 2019-06-27 发布于浙江
  • 举报

塑胶零件dfm检讨报告(方案成熟阶段) 2013英文版精编版.pptx

Project name, part name;Summary of opening critical issues ;;4: Output—molding study; A: Geometry received (updated 3D) product overview (size appearance, features);Input; B: Material selection for this part ;C: Visual surfaces’ requirement;Input;Proposal agreed by;Proposal agreed by;Proposal agreed by;E4: Conclusion about current wall thickness design;F1: proposed sequence of surfaces’ released (including proposed parting lines.);f1.1: (output detail);F2: proposed sequence of surfaces’ closing;Proposal agreed by;agreed by;This report should not be used accordingly for mold making once any information input remarked in segments A,B,C D changed.; 1: gate solution hasn’t been agreed by designer. (gate position, method size; runner) 2: there are main wall thickness issues. (uneven main flow tunnel (injection packing), thin wall part (injection), cooling) 3: solution of part released hasn’t been agreed by NPI mold ENG. (sequence of surfaces released, surface finish ,parting lines, undercuts ejecting, ) 4: solution of mold close hasn’t been agreed by NPI mold ENG. (weak steel);END

文档评论(0)

1亿VIP精品文档

相关文档