- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Unit 2 Auxiliary Machinery
Lesson 13 Marine Boilers and Their Construction
A boiler in one form or another will be found on every type of ship. Where the main machinery is steam powered, one or more large water -tube boilers will be fitted to produce steam at very high temperatures and pressures. On a diesel main machinery vessel, a smaller (usually fire tube type) boiler will be fitted to provide steam for the various ship services. Even within the two basic design types, water tube and fire tube. A variety of designs and variations exist.
A boiler is used to heat feed water in order to produce steam. The energy released by the burning fuel in the boiler furnace is stored (as temperature and pressure) in the steam produced. All boilers have a furnace or combustion chamber where fuel is burnt to release its energy. Air is supplied to the boiler furnace to enable combustion of the fuel to take place. A large surface area between the combustion chamber and the water enables the energy of combustion, in the form of heat, to be transferred to the water.
A drum must be provided where steam and water can separate. There must also be a variety of fittings and controls to ensure that fuel oil, air and feed water supplies are matched to the demand for steam. Finally there must be a number of fittings or mountings which ensure the safe operation of the boiler.
In the steam generation process the feed water enters the boiler where it is heated and becomes steam. The feed water circulates from the steam drum to the water drum and is heated in the process. Some of the feed water passes through tubes surrounding the furnace, i.e. Water wall and floor tubes, where it is heated and returned to the steam drum. The steam is produced in a steam drum and may be drawn off for use from here. It is known as wet or saturated steam in this condition because it will contain small quantities of water. Alternatively the steam may pass to a super heater which is located within the boiler. Here
您可能关注的文档
- 流行病学在社区护理中的应用-社区护理学(全套完整课件)-课件.ppt
- 硫酸锰生产新工艺研究.doc
- 六边形垫片的复合模设计(有图纸).doc
- 六档变速器超详细毕业论文.doc
- 六年级备考会议发言 (共5篇).doc
- 六年级上册语文重点课文课内阅读题.doc
- 六年级英语下册unit2last weekend说课稿.docx
- 六一儿童节的两人搞笑短小品.doc
- 六一儿童节发言稿庆六一乡党委政府领导讲话稿.doc
- 龙门吊安拆安全协议.doc
- 《JJF 2132-2024荧光紫外灯人工气候老化试验装置校准规范:辐射照度参数》.pdf
- JJF 2120-2024轮速传感器校准规范.pdf
- 计量规程规范 JJF 2120-2024轮速传感器校准规范.pdf
- 《JJF 2129-2024钙钛矿太阳电池校准规范:光电性能参数》.pdf
- JJF 2129-2024钙钛矿太阳电池校准规范:光电性能参数.pdf
- 《JJF 2120-2024轮速传感器校准规范》.pdf
- JJF 2117-2024沥青混合料理论最大相对密度仪校准规范.pdf
- JJF 2116-2024特定蛋白分析仪校准规范.pdf
- 《JJF 2116-2024特定蛋白分析仪校准规范》.pdf
- 计量规程规范 JJF 2117-2024沥青混合料理论最大相对密度仪校准规范.pdf
文档评论(0)