- 7
- 0
- 约3.3千字
- 约 12页
- 2019-06-14 发布于湖北
- 举报
结算--新签订合同(英语版对话)
what should we do before signing a contract;Dialogue 1; Mickey:So now Ill change the wording regarding
shipment as follows:the first shipment to be made on or before Octorber 25th,2003 and the second shipment to be effected within 30 days after the first shipment .
Mavis: That sounds good .Though we have established the deadline for both the first shipment and the second shipment ,Id prefer that you ship as soon as possible.
;
Mickey:Well ship as soon as your L/C arrives .
Mavis:Thank you very much .
Mickey:Any other suggestions?
Mavis:I want to clarify your responsibilities for comp
您可能关注的文档
最近下载
- 十大分部分项工程划分标准.doc VIP
- 2026年江苏省苏豪控股集团有限公司校园招聘笔试模拟试题及答案详解.docx VIP
- 21 CFR Part 820 (up to date as of 1-29-2026)_中文翻译(机翻).pdf VIP
- 手持电动工具安全培训.pptx VIP
- 公司重要岗位竞争上岗管理办法和实施方案范文最新.doc VIP
- 2026年最新全国交管12123驾驶证学法减分(学法免分)考试题库(含答案).docx
- 移动及手持电动工具定期绝缘电阻测验记录表[文档推荐] .pdf VIP
- 《美丽乡村建设状况》课件.ppt VIP
- 手持电动工具培训.pptx VIP
- 项目经理带班制度.doc VIP
原创力文档

文档评论(0)