2019-2020年XX公司集团防火安全管理制度.docVIP

  • 4
  • 0
  • 约1.25万字
  • 约 12页
  • 2019-06-30 发布于山东
  • 举报

2019-2020年XX公司集团防火安全管理制度.doc

地形平坦开阔,地层由第四系全新冲积层,第四系上更新统冲层组成,局部表覆第四系全新统人工堆积层。第四系全新统冲积层厚度约25~50m,岩性主要为黏土、粉质黏土、粉土、粉砂、细砂;第四系上更新统冲积层厚度大于50m,岩性主要为黏性土、粉土、粉细砂等。管桩深度范围内地层主要为:粉土、黏土、粉质黏土,局部表层为杂填土。coupling Centre shall be checked, the second poured concrete strength of more than 70%. In the process of reaming or boring, apart from the special provisions in factory, does not allow any work that may affect the coupling Centre, such as irrigation, to cylinder connections to flood the condenser pipes and so on. Well boring, hinge bolt hole flange with coupling of vertical, not oblique. Mounting bolts should be added lubricants, typing

文档评论(0)

1亿VIP精品文档

相关文档