××××××××××门架设施工程
《施工组织设计方案》
××××××××有限公司
20 年 月 日
目 录
一、 工程概述·····················································································3
二、 编制依据及执行标准·····································································3
三、 工程施工方案················································································4
四、 施工进度安排················································································5
五、 劳动力计划···················································································5
六、 主要施工机械设备··········································································5
七、 门架制作························································································7
八、? 门架安装························································································8
九、 施工安全管理措施·······································································10
十、 安全文明施工措施·······································································12
十一、工程质量保证措施·······································································16
十二、施工管理机构配置·······································································17
《施工组织设计方案》
工程概述:
1. 施工项目:×××××××××门架设施工程安装施工。
2. 工程地点及结构概况:
2.1××××××路×座跨度××米,净空高度××米门架;
2.2××××××路×座跨度分别是××米和××米,净空高度××米门架;
2.3××××××路×座跨度分别是××米、××米和××米,净空高度××米门架。
3. 工期要求:计划20××年××月××日开工,20××年××月××日竣工,总工期××个日历天。
4. 工程范围:按业主方招标文件工程量清单及对应施工图纸上涵盖的所有门架设施工作内容,本工程施工范围包括门架基础的现场浇筑、门架设施在生产车间的加工制作和门架设施的现场安装施工。
二、编制依据及执行标准:
1. 根据业主的施工合同文件、答疑文件及全套施工图纸、工程清单等;
2.《公路养护安全作业规程》(JTG H30-2015);
3.《道路交通标线和标志》(GB 5768-2009);
4. 钢结构设计规范(GB50017-2014);
5. 钢结构工程施工及验收规范(GB50205-95);
6. 钢结构工程施工质量验收规范(GB50205-2001);
7. 钢结构焊接规范(GB50661-2011);
8. 钢结构工程施工规范?(GB 50755-2012);
以及工程执行的现行国家、地方颁布的标准规范、规程及相关政策法规。
三、工程施工方案:
1. 施工准备:开工前进行技术交底及开工准备会,组织工程相关单位进行现场交底,确定限高架设置的详细位置(明确到具体尺寸)、高度,同时举行开工准备会,统一协调限高架制作与施工过程中的责任分工及注意事项,明确施工各工序检查和验收的步骤,确定开工时间;??? 2. 组织有关工程管理和技术人员对设计图纸进行会审。对图纸不明确及施工中有困难的地方,要与设计单位作好变