ABSTRACT
Adjacent to the surrounding buildings ,so many underground pipelines, close to
the busy traffic,the JingJiang Transfer station engineering in Tianjin metro line 2 is
very difficult ,so the construction of the deep pit needs high technical requirements.In
tianjin urban construction for foundation pit in soft soil layer construction must be
safety, and the precipitation and earthwork excavation and foundation pit deformation
control put forward higher requirements.
Based on the construction period o