- 4
- 0
- 约1.85万字
- 约 60页
- 2019-08-07 发布于湖北
- 举报
Line Balance Model * Model will build the following graph which shows how we should plan to: Staff in equal increments (to limit having to re-balance line) Vary hours worked to get complete coverage of demand requirements Process Balance Model:Step 4 (Cont.) Line Balance Model * 模型可建立如下图说明: 每一阶段需要的人力 完成任务需要的工作时间 过程平衡模型:步骤 4 (续.) Line Balance Model * Step 5 Plot current operating range to determine labor reduction required to meet operating goals Process Balance Model:Step 5 The model has calculated that at a rate of 150 units/day, the area should be working a 6 hour shift with 7 processors
您可能关注的文档
最近下载
- 罗氏 e 601 电化学发光免疫分析仪用户操作手册(中文).pdf VIP
- 临时施工道路、堆场地基承载力计算书.docx VIP
- J-STD-033标准中文版文档.docx VIP
- 采空区抽放瓦斯安全技术措施.docx VIP
- 整套土建工程技术技术交底-精华版.doc VIP
- 我爱家乡山和水优秀.ppt VIP
- 华创证券-精锋医疗~B-2675.HK-深度研究报告-国内加速进口替代,海外广阔市场开启放量.pdf VIP
- 北京市中国人民大学附中2023-2024学年高一上学期期中生物试题 含解析.docx VIP
- ISO 9227 中文版 人造气氛腐蚀试验 盐雾测试方法.docx VIP
- ISO 9227-0607-中文版 (盐雾试验).pdf VIP
原创力文档

文档评论(0)