发电机交流耐压试验作业指导书.docxVIP

  • 6
  • 0
  • 约1.2万字
  • 约 10页
  • 2019-08-11 发布于湖北
  • 举报
Work Instruction for Generator HV Withstand Test KTPP-0-SEPS-COM-WI-4009 Rev. Date Compiled by Review Approval Work Instruction for Generator HV Withstand Test Document No KTPP-0-SEPS-COM-WI-4009 PROJECT 4x350 MW Kamalanga Thermal Power Project OWNER GMR卡玛朗加能源有限公司 GMR KAMALANGA ENERGY LIMITED OWNER’s ENGINEER 拉玛雅国际咨询有限公司 LAHMEYER INTERNATIONAL (INDIA) PVT. LTD. CONSULTING ENGINEERS,GURGAON EPC CONTRACTOR 山东电力基本建设总公司 SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION SUB CONTRACTOR 工程概况 Brief introduction of the project 卡玛朗加火力发电厂由GMR能源有限公司在现场兴建,该位置位于印度奥里萨邦德赫克纳尔区。该项目为新建工程,包括四台机组,每台机组容量为350MW。本工程采用东方电机股份有限公司生产的三相发电机,额定功率350MW,功率因数0.85,端电压20kV,频率50Hz,转速为3000rpm。汽轮发电机采用水-氢-氢冷却方式。 The Kamalanga Thermal Power Station would be set up by GMR kamalanga Energy Limited at a site, which falls under the Dhenkanal district of Orissa, India. The project is a Greenfield project consisting of four units each of 350 MW. The generators proposed for the plant are of three phase, manufactured by DFEM, with the rated power of 350MW, power factor of 0.85 lagging, terminal voltage of 20kV, frequency of 50Hz and speed of 3000rpm. The turbine generator adopts the typical water-hydrogen-hydrogen cooling system. 编制依据 References of the compilation 下列文件中的条款通过本作业指导书的引用而成为本作业指导书的条款。 The prescriptions in the documents listed below are included in this work instruction by quotation. 2.1)GB 50150-2006 电气设备交接试验标准; GB50150-2006 Standard for hand-over test of electric equipment ; 2.2)DL5009.1-2002 电力建设安全工作规程 DL5009.1-2002 Safety work regulations of electric power construction 2.3)QFSN-300-2-20型汽轮发电机安装说明书 QFSN-300-2-20 Turbine generator installation manual 试验项目及程序 Testing items and progress 3.1)试验项目 Testing items 3.1.1)定子绕组的绝缘电阻、吸收比、极化指数测量。 Measurement of IR、Absorptance、Polarization index of stator winding. 3.1.2)定子绕组端部现包绝缘施加直流电压测量。 DC HV test of generator stator winding overhang handmade insulation. 3.1.3)定子绕组直流耐压试验和泄漏电流测量。 St

文档评论(0)

1亿VIP精品文档

相关文档