港珠澳大桥英语知识演讲.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Hong Kong-Zhuhai-Macao Bridge;Contents;3. 工程总体方案;1. Brief Introduction;Two artificial islands An immersed tube tunnel The Y-shaped bridge ;Total lenght: 49.97 kilometers Underwater tunnel: 6.7 kilometers Bridge over the sea: 23 kilometers ;1.the life span of the bridge is set at 120 years. 2.It reportedly can stand magnitude-8 earthquake, scale-16 typhoon as well as the collision with a 300,000-ton ship;;;;The East Island has 59 round steel cylinders圆钢筒. The West Island has 61 round steel cylinders. The diameter of a single cylinder is 22.0m, and the cylinder wall is 16mm thick. The height of round steel cylinder is 40.5m to 50.5m. The round steel cylinder weighs 445t to 507t.;4. The Immersed Tube Tunnel;The water resistance ratio must be limited to 10% to prevent accumulation of sediment at the Lingdingyang Channel, otherwise it will impose serious impact on the Pearl River flow path and flood-discharge capacity, according to a government report. Due to the long distances between the cities, the project is actually a series of bridges and tunnels, connected by artificial islands,this was the first time China has built an immersed tube tunnel (沉管隧道)in open waters. The 33 tubes will compose a 5.6-kilometer immersed-tube tunnel, which is designed to be an important part of the bridge. Each of the tube, with a weight of 80,000 tons and a length of 180 meters, takes about two months to build.;5.The Significances;The End! Thanks for your attention!

文档评论(0)

开心就好 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档